CVM: designing and analysing a WTP survey
Put a money value on things with no price tag — scenario, bids, protest answers and total benefit.
How much is it worth to residents to restore a local stream to a natural, living waterway?
"What is a restored stream worth, in money?"
Parks, streams and heritage sites are not bought and sold in shops, so they carry no price tag. Yet to decide whether a project goes ahead, you need to show its benefits in numbers to set against the cost. This post covers the contingent valuation method (CVM), which uses a survey to value things that have no market price.
What is CVM?
CVM stands for Contingent Valuation Method. It presents a hypothetical situation (a scenario) — "if this project went ahead" — asks how much people would pay for it, and estimates its value in money.
The amount is called willingness to pay (WTP), and it is widely used to estimate the benefits of public projects.
The survey has three parts
① Scenario — make clear how things are now, what changes after the project, and who pays and how.
② Payment vehicle — choose a realistic way of paying: taxes, utility bills, donations, entrance fees. Include the period and unit, such as "per household, per year".
③ Amount question — "If your household had to pay ___ more each year, would you pay it?", answered yes or no for the amount shown.
Choosing how to ask
| Format | How it works |
|---|---|
| Single-bound | One amount, asked once |
| 1.5-bound | One more amount only if the answer falls inside the range |
| Double-bound | Ask again at double after "yes", or half after "no" |
| Payment card | Pick the largest amount you would pay from a list |
| Open-ended | Type the most you would pay |
The key is to show different amounts to different respondents. WTP is estimated from how the share saying "yes" falls as the amount rises.
Double-bound gives the tightest estimate for the same number of responses, but it is criticised because the second answer tends to lean on the first amount. Choose what fits your study.
Setting the bid amounts
Usually you run a pilot first. Ask open-ended "What is the most you would pay?" and set the main survey's bids at the 10th, 30th, 50th, 70th and 90th percentiles of those answers.
Five to seven bids work well, and the top bid should be high enough that "yes" drops well down.
Safeguards for answer quality
- "Answer as if paying for real" reminder — reduces overstated answers
- Budget reminder — money paid here cannot be spent elsewhere
- Certainty — how sure the respondent is of that answer, 1–10
- Scenario check — whether they understood it, and believe the project will happen
And always ask why someone would pay nothing. Answers that object to the way of paying rather than to the value — "the government should pay for it" — are protest answers and are left out of the estimate.
Reading the results
① Acceptance by amount — the share saying "yes" at each amount. It should fall as the amount rises.
② Mean and median WTP — found by fitting a curve (logit or similar) to the acceptance rates. The mean feeds cost-benefit analysis; the median is "the amount at least half would accept".
③ Total benefit — mean WTP × the number of households that benefit. Add the project life and a discount rate to get the present value. Korea's preliminary feasibility studies, for example, often use a 4.5% social discount rate; use the rate your own guidance sets.
An example — restoring an urban stream
Say 342 district residents were asked in the double-bound format. Leaving out 12 who did not finish and 27 protest answers, 303 valid responses were analysed (amounts in Korean won).
| Bid | Share saying "yes" |
|---|---|
| KRW 2,000 | 84% |
| KRW 5,000 | 75% |
| KRW 10,000 | 67% |
| KRW 20,000 | 40% |
| KRW 40,000 | 10% |
Fitting the curve, mean WTP per household was about KRW 18,000 a year, with a median of about KRW 17,000. Multiplied by the district's 180,000 households, the yearly benefit is about KRW 3.3 billion, and its present value over 10 years at 4.5% is about KRW 25.9 billion.
How to write it up
Using double-bounded dichotomous-choice CVM, mean annual willingness to pay per household for the urban stream restoration project was about KRW 18,000 (95% CI 16,000–20,000). Applied to the 180,000 target households, the yearly benefit is about KRW 3.3 billion; with a 10-year project life and a 4.5% social discount rate, its present value is about KRW 25.9 billion.
In Skari
In the Skari survey editor, open Specialized analyses in the question type panel and pick CVM · contingent valuation. A setup window opens.
- What is being valued — the project name and scenario
- The amount question — fill in who pays, how often and how, and the sentence is written for you
- How to ask — single, 1.5 or double-bound, payment card, open-ended
- Bids — for double-bound, the follow-up amounts after "yes" and "no" are shown too
- Paying nothing, and why — mark which reasons count as protest
- Certainty and total benefit — population, project life, discount rate
- Group questions — household income, age group, gender, region, household size
The recommended number of responses is worked out from the number of bids. Paste in pilot answers and it can fill the bids from their percentiles.

Add it to your own survey
Pick CVM · contingent valuation under Specialized analyses
Respondents see the scenario screen first, then answer yes or no to the amount assigned to them. Each respondent gets the least-assigned amount, so amounts are spread evenly.

The report sets out mean and median WTP with confidence intervals, acceptance by amount and the willingness-to-pay curve, and — if you entered a population — total benefit and present value.


You also get a logit vs probit model comparison, a sensitivity analysis that re-estimates under other assumptions, a first vs second answer comparison for double-bound, and mean WTP by group from your group questions.

The report downloads as Word or PDF.
The heart of CVM is a good scenario and well-chosen bids. With a solid survey design, even value without a price tag can sit next to the cost in the discussion.
Want the theory behind it?The Academy's binary logistic regression chapter shows how a curve is fitted to yes/no answers →