Product/Surveys/Valuation (CVM)
₩ CVM · Contingent valuation

What is a project with no price worth?

No price tag?
You can still put a value on it.

Value environmental improvements, public projects and other non-market goods. Ask people what they would pay, and turn their answers into an economic value.

5 question formatsAutomatic bid assignmentReasons behind ₩0 answersEconomic value estimate
5
Question formats
300
Respondents in the example
₩6,019
Mean annual WTP (example)
₩120.4B
Annual benefit (example)

No price — so how do you value it?

No market price to compare against
01
People can’t easily name what they’d pay
02
Bid amounts must be spread across respondents
03
“Can’t pay” must be told apart from “won’t pay”
04

CVM measures willingness to pay to estimate the economic value of non-market goods.

01 · From survey to analysis

Describe the project, set the bids.
We take it from survey to value.

Describe the project and payment vehicle, then pick a question format and bids. As responses arrive, see WTP by bid and mean WTP.

Contingent valuation · Han River water qualityDouble-bound
① Good being valuedHan River water quality project
Today: grade 3 water — fine for boating, not swimming.After: grade 2 water — safe for summer swimming.All households share the cost.
Any format. Respondents see it first, on a single screen.
② WTP questionhousehold · yearly · water bill
Would your household pay {amount} more a year on its water bill for this project?
③ FormatDouble-bound — follow up at 2× after yes, ½ after no
Single-boundOne-and-a-half-boundDouble-boundPayment cardOpen-ended
④ BidsEach respondent gets the least-assigned bid
1,0002,0004,0008,00016,000
60 per bid · or paste pilot answers to fill them in.

Setup

FormatDouble-bound
Bids5
Ask intent firstOff
“Pay for real” reminderOn
Scenario checksOn
Certainty (1–10)On
Population · years · discount rate20M · 30 yrs · 4.5%

Recommended sample: 300 (5 bids × 60). Excluding protest responses shrinks it, so collect 10% extra.

Insert questions
You only write the project description, the WTP question and the bids.

02 · Formats and bids

Let people name a price,
or respond to one you set.

Pick the format that fits your study. In bid-based formats, each respondent sees one assigned amount and says whether they’d pay.

5 question formats

Ask once, follow up based on the answer, pick from a list, or write an amount in.

Format5 kinds
Single-boundOne bid, asked once
One-and-a-half-boundFollow-up only inside the range
Double-boundYes → double · No → half
Payment cardHighest listed amount they’d pay
Open-endedWrite-in amount · for pilots

Automatic bid assignment

Preset bids are assigned automatically and balanced so no single amount gets overloaded.

Bid assignmentTarget: 60 per bid
₩1,000 → 2,000 / 50060 ✓
₩2,000 → 4,000 / 1,00060 ✓
₩4,000 → 8,000 / 2,00060 ✓
₩8,000 → 16,000 / 4,00060 ✓
₩16,000 → 32,000 / 8,00060 ✓

Ties are broken at random. Surveys rendered via the public API (v1) use the same logic.

03 · Report

Every result in one place.
Export to Word or PDF.

WTP, economic value and validity checks, compiled into one report. Here’s what it looks like.

04 · Validity checks

Survey amounts.
Can you trust them?

Stated WTP isn’t real spending. Check answer certainty, reasons for ₩0 and bid effects, and see how much the estimate moves.

Hypothetical answers

With no real money at stake, people may overstate. Compare estimates across certainty levels.

Hypothetical biascertainty 1–10
Main estimate₩6,019
“Yes” under 6 points → “no”₩5,181
“Yes” under 7 points → “no”₩4,284
“Yes” under 8 points → “no”₩3,539

Change the cutoff (6 · 7 · 8) in the results tab. If the gap is large, report both.

Protest responses

Why someone says ₩0 matters. Separate “no value” answers from objections to the payment vehicle.

Reasons for ₩0300 responses
Government should pay7 protest · excluded
Against higher taxes or fees13 protest · excluded
Don’t trust the project11 protest · excluded
No value · can’t afford · other44 kept as ₩0

Choose which reasons count as protest in setup.

First-bid anchoring

The first bid can sway the follow-up answer. Compare against first answers only.

Starting-point effectdouble-bound
First and second answers₩6,019
First answers only (as single-bound)₩5,841
Answer correlation ρ0.867 ⚠ below 0.9
Test μ₁ = μ₂p .773

When ρ is low, the report prompts you to include the first-answers-only value.

Bid range

The bid range can shift the estimate. Check how many still say yes at the top bid.

Bid range check₩1,000 – 16,000
“Yes” at lowest bid76.4%
“Yes” at highest bid9.6% under 15% ✓
Truncated mean (up to ₩32,000)₩6,018
Turnbull lower bound (no curve assumed)₩4,344

Bids are usually set from open-ended pilot percentiles.

05 · Going further

Beyond mean WTP:
group differences and total value.

Covariates · WTP by group

See how WTP varies by income or age.

Mean WTP by incomeper yr · 4 groups
Under 2M · base₩5,706
2–4M₩6,114
4–6M₩5,504
6M or more₩6,650

Likelihood ratio p .612 — income differences aren’t significant here.

Economic value estimate

Scale mean WTP to total annual benefit and present value over the project life.

Economic value30 yrs · 4.5% discount rate
Mean × population₩6,019 × 20M
Annual benefit₩120.4 billion
Present value₩1.961 trillion
Present value, 95% CI₩1.7408 – 2.2235 trillion

4.5% is Korea’s preliminary feasibility social discount rate. You can change it.

Bids from a pilot

Set main-survey bids from pilot answers.

Fill from pilotopen-ended, 52 people
10th percentile₩1,000
30th · 50th percentile₩2,000 · 4,000
70th · 90th percentile₩8,000 · 16,000
Recommended main sample5 amounts × 60

Rounded to clean figures; duplicates are merged.

No price? Survey the value.

Write the questions, collect answers and estimate economic value — then export the report.

5 question formatsAutomatic bid assignmentReasons behind ₩0 answersWord · PDF · public API