PART 4 · 15 Optimization theory · 05

Mixed-Integer Programming

Optimization that uses integer and continuous variables together

Binary variablesContinuous variablesBig-M constraintsFixed costsFacility locationBranch and boundOptimality gap

PlantBuild? 0 / 1Output x0 to 10 (continuous)x ≤ M · yOnly if builtcan it produce

How do you optimize a problem that mixes integer and continuous variables, such as budgets, whether to install equipment, and production quantities? If you run a plant, you have to decide together whether to build a new plant and, if you do, how much to produce, and raw-material and operating costs also change with the production quantity. Whether to build can be expressed as 0 or 1, and the production quantity as a continuous value.

SECTION 01

What is mixed-integer programming?

A method that uses integer and continuous variables together in one optimization model is called mixed-integer programming (MIP). If the objective function and constraints are linear, it is called mixed-integer linear programming (MILP).

SECTION 02

How is it different from integer programming?

ModelVariable typeExamples
Linear programming (LP)Continuous variablesRaw-material use, budget amounts allocated
Integer programming (IP)Integer variablesNumber of employees, number of vehicles
Mixed-integer programming (MIP)A mix of integer and continuous variablesWhether to build a plant, and production quantity

If we use y for whether the plant is built and x for the production quantity, then y ∈ {0, 1} and x ≥ 0. To make production impossible when the plant isn’t built, we add the following constraint.

x ≤ M y
M: upper limit on production · if y = 0, then x ≤ 0, so production is 0 · if y = 1, then x ≤ M

This one constraint links the "yes/no" decision of whether to build with the "how much" decision of the production quantity in a single model.

SECTION 03

Example: building a plant and deciding how much to produce

ItemValue
Fixed cost of building the plant$600
Revenue per unit$200
Variable cost per unit$80
Maximum production10 units

The profit per unit is $200 − $80 = $120, so the model is:

max Z = 120x − 600y   s.t.   x ≤ 10y,   x ≥ 0,   y ∈ {0, 1}
ChoiceProduction xBuilt? yTotal profit
Don’t build00$0
Build, produce 5 units51$0
Build, produce 8 units81$360
Build, produce 10 units101$600
-6000600Not built (y = 0) → 0Break-even: 5 units8 units → 36010 units → 600 (optimal)Max output 10024681012If built, −600 even at x = 0Total profit Z ($)Production x · if built (y = 1), Z = 120x − 600; if not built (y = 0), no production and Z = 0
Figure 1. Profit by whether the plant is built and how much is produced

Once the plant is built, the $600 fixed cost is incurred even with no production, and break-even comes at 5 units, where 120x = 600. Beyond that, profit builds up with each unit, reaching its largest value, $600, at the maximum output of 10 units. If maximum output had been 5 units or fewer, not building the plant would be optimal. In problems with fixed costs, profit takes a step shape that "drops once the moment you build," which linear programming alone can’t express, so a binary variable is needed.

SECTION 04

Which of several candidate sites should you build at?

Mixed-integer programming is also used to decide where among several candidate sites to build facilities. Suppose a logistics company wants to build distribution centers at some of three candidate sites, and each site differs in building cost, handling capacity and shipping cost to each customer.

min Σj fjyj + Σi,j cijxij   s.t.   Σj xij = di,   Σi xij ≤ Cjyj
yj: whether site j is built (0/1) · xij: volume shipped from site j to customer i · fj: building cost · cij: shipping cost per unit · di: demand · Cj: handling capacity

If a center isn’t built (yj = 0), its shipping volume is 0 too; if it is built, volume can be allocated up to its capacity.

302553515S1 not builtFixed $6K · cap. 80S2 builtFixed $5K · cap. 60S3 builtFixed $4K · cap. 50C1Cust. 1 · demand 30C2Cust. 2 · demand 25C3Cust. 3 · demand 35C4Cust. 4 · demand 20Optimal plan: building $9,000 + shipping $5,900 = total $14,900 · numbers on lines = volume shipped (hypothetical data)
Figure 2. Distribution center locations and shipping plan

Solving with the hypothetical data in Figure 2 (3 candidate sites, 4 customer regions, total demand 110), it is optimal to build at S2 and S3 and not at S1, and the total cost is $14,900: $9,000 in building costs plus $5,900 in shipping costs.

$0$6,000$12,000$18,000S2+S3$14,900S1+S3$15,500S1+S2$17,200S1+S2+S3$19,800Fixed costShippingOnly combinations whose capacity covers demand (110)
Figure 3. Total cost by combination of sites built

In Figure 3, building all three sites lets each customer be served from a nearby center, so shipping costs are the lowest at $4,800, but building costs run to $15,000, for a total of $19,800. On shipping costs alone, S1+S3 ($5,500) is also cheaper than the optimal combination, but its building costs are higher. That is why building and shipping costs must be considered together.

SECTION 05

Common modeling techniques in mixed-integer programming

x ≤ 10y5y ≤ x ≤ 10y (minimum output)y = 0y = 10510y = 0y = 1If built, below 5 not allowed0510Blue = allowed (x, y) · if not built, x = 0; if built, x is continuous up to the upper bound (and above the lower bound)
Figure 4. Using a binary variable to bound the range of a continuous variable

Linking a yes/no choice to an activity level

A situation where you can produce only if the equipment is installed is expressed as x ≤ My. However, if M is made needlessly large, the relaxed problem with the integer condition dropped drifts away from reality and computation becomes less efficient, so it’s best to use a meaningful value, such as the upper limit on possible production.

Minimum production condition

5y ≤ x ≤ 10y
if y = 0, then x = 0 · if y = 1, then 5 ≤ x ≤ 10

As on the right of Figure 4, the minimum production condition applies only if the plant is built. A condition like "if you produce at all, at least 5 units" can’t be expressed with continuous variables alone.

Choosing only one of several options

y1 + y2 + y3 = 1 (exactly one)  ·  y1 + y2 + y3 ≤ 1 (at most one)

Constraints like these are used in many problems, such as program selection, project investment, facility location and product mix.

SECTION 06

How is mixed-integer programming solved?

Because of the integer conditions, computation can be more complex than in linear programming. The standard method is branch and bound (Ch. 04).

① Relax

Solve the linear program with the integer conditions relaxed.

② Branch

Split into subproblems on a variable that doesn’t satisfy its integer condition.

③ Compare

Compare the optimization results of each subproblem.

④ Prune

Drop subproblems that can’t produce a better solution.

⑤ Search

Search the remaining candidates to find the optimal solution.

Real optimization software combines branch and bound with cutting planes, heuristics and preprocessing. As problems grow, proving optimality can take a long time, so alongside a good solution found within a time limit you may also check the optimality gap: the difference between the current solution and the bound given by the relaxed problem (the same principle as duality, Ch. 03).

SECTION 07

Where mixed-integer programming is used

FieldExample uses
Production managementWhether to install equipment and how much of each product to make
LogisticsOptimizing distribution center locations and shipping volumes
Workforce managementStaff assignments and working hours
EnergyWhether to run each generating unit and how much power to generate
InvestmentWhich projects to choose and how much to invest
Telecom · networksWhere to put facilities and how much network capacity to build

Mixed-integer programming is especially suited to problems where yes/no choices and continuous activity levels are linked.

Sample write-up

We solved a mixed-integer linear programming model that jointly decides whether to build distribution centers at 3 candidate sites (binary variables) and the shipping volumes to 4 customer regions (continuous variables). The optimal plan was to build at S2 and S3, for a total cost of $14,900 ($9,000 building, $5,900 shipping), $4,900 less than building all three sites ($19,800).

✓ KEY TAKEAWAYS

Express "whether" with binary variables and "how much" with continuous ones, and link them with constraints.


Up next: 06 Nonlinear Optimization. We’ll cover problems where cost isn’t proportional to output, or where variables are related through products, squares or curves.